The Kwoiek Creek Hydroelectric Project is a 49.9 MW, run-of-river project located on the lower reaches of Kwoiek Creek, a tributary to the Fraser River, approximately 14 km south of Lytton, British Columbia. The Project will include a water diversion and intake facilities, a buried penstock and a powerhouse. To facilitate all-weather construction and work preparation,
BuildWorks constructed this XL40 MegaDome® workshop facility for CRT Construction, the general contractor, on top of two parallel rows of sea containers. Motorized overhead doors at front and back provide efficient access for men and equipment.
Please fill out the form below to request to quote.